Replacement of switching equipment at transformer substation TP-2905

  • Bringing project documentation (2013) into line with current standards and requirements.
  • Palace employees replaced the automatic reserve input on the main distribution board, and the system is now operating reliably.
  • Repair work on the main distribution board to replace the 1959 motor-driven automatic circuit breakers with new ones.
  • Laying of control and alarm circuit cables.
  • Installation of a new AVR (automatic reserve input) panel.
  • Debugging and commissioning of new equipment. Manufacture and installation of new panel equipment in RU 0.4kV TP-2905.
  • All equipment is designed with the possibility of subsequent installation of dispatching systems.